Service Discipline 06

Planning & Delay Analysis

Construction projects rarely fail due to structural inadequacy; they fail because of uncontrolled schedules, creeping delays, and unresolved contractual claims. Fusion Developers provides enterprise-grade project controls utilizing Primavera P6. We establish defensible baseline schedules, monitor weekly critical-path movement, and conduct forensic delay analysis to defend and substantiate Extension of Time (EOT) claims.

📅

Primavera P6 Baselines

Enterprise Work Breakdown Structure (WBS) with resource-loaded logic networks

📈

Progress S-Curves

Weekly earned value tracking comparing planned value (PV) against actual progress (EV)

⚖️

Forensic Delay Analysis

Time Impact Analysis (TIA) and Windows Analysis compliant with the SCL Delay Protocol

🛡️

FIDIC EOT Claims

Defensible claims documentation substantiating delays, disruptions, and prolongation costs

Controlling the Critical Path with Scientific Rigor

Every major project delivered by Fusion Developers operates under a strict Primavera P6 baseline. By identifying the critical path—the sequence of dependent activities that determines total project duration—we ensure site resources are directed where they matter most, preventing non-critical diversions from delaying commercial handover.

Delay Analysis Methodology Application Scenario SCL Protocol Standing
Time Impact Analysis (TIA)Prospective delay assessment during ongoing constructionGold standard for prospective Extension of Time (EOT) entitlement
As-Planned vs As-BuiltSimpler retrospective disputes with clear record keepingWidely accepted for straightforward, single-delay events
Collapsed As-Built (But-For)Evaluating project duration had employer delays not occurredHighly persuasive in arbitration when testing owner interference
Window / Period AnalysisComplex projects with multiple concurrent delays over timeThe most rigorous retrospective method for dynamic critical-path shifts

Technical Specifications & Design Standards

Project Planning & Claims Consulting Services

Consult with Our Senior Engineering Desk

Share your plot dimensions (frontage × depth in ft), planned usage, and target handover date. We provide a rigorous feasibility position and audited PKR rate range within 24 hours.

WhatsApp Direct (+92 332 2227426) Submit Technical Brief

Frequently Asked Questions

What is the Critical Path Method (CPM) and why is it vital for contractors?
The Critical Path is the longest sequence of dependent activities from project start to finish that has zero float. If any activity on the critical path is delayed by a single day, the entire project completion date slips by one day. CPM allows project managers to focus site resources directly on critical activities.
What is Time Impact Analysis (TIA)?
TIA is a forward-looking delay analysis method that inserts a quantified delay event (such as a late drawing issue or major scope change) into an unimpacted CPM schedule right before the event occurred. It scientifically demonstrates the exact delay entitlement caused by the event.
How does an S-Curve reveal project performance?
An S-Curve plots cumulative progress over time. By comparing the Planned Value curve (baseline) against the Earned Value curve (actual achieved work) and Actual Cost curve, management instantly visualizes whether the project is ahead/behind schedule and under/over budget.
How do you handle concurrent delays between the contractor and employer?
Under the SCL Delay Protocol, when employer delay and contractor delay occur concurrently, the contractor is generally entitled to an Extension of Time (relieving them of liquidated damages) but not prolongation costs. Our forensic scheduling models isolate concurrent windows to establish clear legal entitlement.
Can Fusion Developers provide project scheduling for third-party developers?
Yes. We provide dedicated project planning, schedule auditing, and claims consulting services for major real estate developers, commercial contractors, and infrastructure agencies across Pakistan and the Gulf.