Contractual Claims · Dispute Resolution

Forensic Delay Analysis for Construction Claims: Methodologies & Legal Defence

When multi-million Rupee construction projects suffer extended completion delays, disputes inevitably erupt over who is responsible. Employers demand liquidated damages (LDs) for delayed commercial opening, while contractors seek prolongation costs for extended site overheads. Forensic delay analysis provides the scientific, evidence-based methodology required to resolve claims under FIDIC and Pakistan engineering contracts.

The Four Primary Forensic Delay Methodologies (SCL Protocol)

  • 1. Time Impact Analysis (TIA): The internationally preferred prospective method. A quantified delay event fragnet (e.g. late client approval of structural drawings) is inserted into the latest updated CPM schedule immediately preceding the event to calculate its isolated critical-path impact.
  • 2. Windows (Time-Slice) Analysis: The gold standard for retrospective dispute arbitration. The project timeline is sliced into monthly update windows. The schedule is evaluated at each window to track how the critical path dynamically shifted over time.
  • 3. Collapsed As-Built (But-For) Analysis: Retrospectively removes employer delay events from the actual as-built schedule to demonstrate the date the contractor 'would have' finished but for the employer's interference.
  • 4. As-Planned vs As-Built: A visual comparison between the original baseline and actual completion dates. Simple to prepare, but fails to account for dynamic critical-path changes or concurrent contractor delays.

The Challenge of Concurrent Delay

A concurrent delay occurs when an employer delay event (such as late access to the site) and a contractor delay event (such as slow mobilization of formwork labor) occur during the same time window. Under modern SCL Protocol guidelines, the contractor is entitled to time extension (relieving them of liquidated damages), but cannot recover prolongation financial costs.

FD

Fusion Developers Engineering Team

Drawing-set discipline across 120+ delivered projects and 2.4M sq ft engineered in Pakistan and the Gulf.

Discuss Your Project with Our Chief Engineer

Get a verified feasibility position, structural concept, and transparent PKR cost range based on your exact plot dimensions.

WhatsApp Direct (+92 332 2227426) Explore Our Planning & Delay Analysis Services →

Frequently Asked Questions

What records are required to prove a construction delay claim in Pakistan?
You must maintain contemporaneous site records: daily progress logs, stamped drawing submission/return transmittals, written requests for information (RFI) with response dates, weather rainfall logs, certified weighbridge receipts, and verified weekly Primavera P6 update files.