Project Case Study · Clear-Span Engineering

Event Complex Qadirabad

PKR 31.1M

Total Project Budget

Column-Free

Clear Span Interior Floor

26 Pages

Multi-Trade Detailed BOQ

Zero Clashes

Coordinated MEP Model

Engineered as an agile, cost-optimized banquet and community event facility in Qadirabad, this project demonstrated Fusion Developers' ability to maximize architectural value on a focused PKR 31.1M budget. By utilizing optimized portal-frame geometries and standardized structural sections, the facility provides an unobstructed clear-span floor with integrated acoustic and climate-control provisions.

Cost-Optimized Frame Geometry

Rather than using off-the-shelf heavy rolled sections, our structural engineers designed tapered plate girders using STAAD.Pro. By reducing flange thicknesses at points of low bending moment, structural steel tonnage was reduced by 18% without sacrificing structural safety factor or deflection limits.

Acoustic Strategy & Ceiling Design

To avoid sound reverberation in a metal building, the roof was specified with double-layer rockwool insulation and perforated liner panels. This economical acoustic treatment keeps internal speech intelligibility crisp while shielding event guests from heavy rain impact noise.

Key Quantities & Project Metrics

Planning a Similar Commercial or Marquee Development?

Fusion Developers provides end-to-end design, structural engineering, BOQ preparation, and turnkey construction across Pakistan and the Gulf. Consult directly with our engineering leadership.

WhatsApp Chief Engineer (+92 332 2227426) Submit Technical Brief