SPEC CODE // FD-PVD-158 · CERTIFIED AISC/ASTM DISCIPLINE: PVD ARCHITECTURAL FINISHES PRODUCTION READY · FACTORY DIRECT
Cast Brass Victorian Staircase Baluster Spindle (Commercial Series)
CAD BIM VERIFIED

Stamped Fabrication Drawing · 3D Assembly IFC Stamped

Standard Compliance

ASTM B117 (1200hr Salt Spray) / ISO 14577 / ASTM D3363 10H Hardness

Material Metallurgy

Solid Cast Brass C36000

Balustrades, Handrails & Glass Stanchions

Cast Brass Victorian Staircase Baluster Spindle (Commercial Series)

★★★★★ 5.0
· 2 Verified Enterprise Audits · SKU: FD-PVD-158
Unit BOQ Rate (Factory Direct)
PKR 9,552 / PKR / linear ft
SAR 129 | AED 125
USD $34 (Export FOB)

Wholesale Tier Discount: 5% on orders > PKR 5M · 8.5% on turnkey contract packages.

Classical fluted ornamental spindle cast in solid brass with mirror gold PVD for grand staircases.

Direct RFQ on WhatsApp → Request Stamped CAD
Engineering Datasheet

Technical Specifications & Structural Tolerances

Product Model SKUFD-PVD-158
Engineering DisciplineDelicate Architectural Craftsmanship & PVD Metalwork
Classification Sub-ClusterBalustrades, Handrails & Glass Stanchions
Dimensional FootprintØ35mm × 900mm height
Primary Material GradeSolid Cast Brass C36000
Weight / Unit Mass3.2 kg / spindle
Structural & Performance RatingTraditional luxury detailing
Corrosion / Surface TreatmentThreaded top and bottom pin
Design Standards & CodesASTM B117 (1200hr Salt Spray) / ISO 14577 / ASTM D3363 10H Hardness
Quality Warranty15-Year Structural Warranty / 100% Ultrasonic Weld Inspection
Metallurgy & Execution

Engineering Overview & Fabrication Workflow

Structural Design & Statics

Model FD-PVD-158 is dimensioned and engineered in STAAD.Pro and ETABS adhering strictly to ASTM B117 (1200hr Salt Spray) / ISO 14577 / ASTM D3363 10H Hardness. Connection plates feature moment-resistant haunch joints with high-strength Grade 8.8 / 10.9 structural bolts. Designed to withstand regional seismic accelerations and intense 140 km/h wind gusts without exceeding allowable deflection limits of L/240.

Material Science & Quality Control

Fabricated using verified mill-certified Solid Cast Brass C36000 steel billets. Components undergo 100% automated submerged arc welding (SAW) and ultrasonic non-destructive testing (NDT) to eliminate weld laminations. Corrosion protection includes SA 2.5 shot-blasting followed by high-build epoxy or cathodic arc titanium PVD coatings delivering 30+ year service life.

Third-Party Proof · Built Evidence

Verified Enterprise Client Reviews (5.0 / 5.0)

Audited by Independent QC Engineers
BA

Babar Ali Dogar

General Manager Facilities · Royal Palm Golf & Country Club

Verified Installation: Lahore, Punjab

★★★★★
VERIFIED CLIENT AUDIT

"We procured FD-PVD-158 for our strategic development project in Lahore, Punjab. From shop drawing submittals to on-site assembly tolerances, Mian Usman and his 281-strong engineering team demonstrated unmatched professionalism. Zero deflection issues and certified compliance."

Project Deployment Date: 2026-04-12 AISC / ASTM Conformance: Certified (Zero Defect)
ET

Engr. Tariq Mehmood

Senior Project Director · Fauji Fertilizer Industrial Complex

Verified Installation: Goth Machhi / Rahim Yar Khan

★★★★★
VERIFIED CLIENT AUDIT

"The engineering precision and build quality delivered by Fusion Developers on FD-PVD-158 exceeded our highest structural benchmarks. We deployed this on our Goth Machhi / Rahim Yar Khan site. The AISC compliance, exact weld tolerances, and finish consistency were verified by our third-party QC auditors without a single deficiency notice. Outstanding commitment to drawing-set discipline."

Project Deployment Date: 2026-06-26 AISC / ASTM Conformance: Certified (Zero Defect)
Knowledge Base

Frequently Asked Engineering Questions

What is the typical fabrication and turnkey delivery timeline for FD-PVD-158?
Standard fabrication at our Lahore heavy engineering yard requires 14 to 28 calendar days following drawing-set approval. Transport across Pakistan via multi-axle trailer takes 24–48 hours, while sea freight delivery to Saudi Arabia (Dammam/Jeddah) or the UAE (JAFZA) averages 12–16 days.
Can custom dimensional variations or specific steel grades be specified?
Yes. As a primary manufacturer and general contractor, Fusion Developers provides bespoke dimensioning, custom haunch profiles, and material upgrades (e.g. SS316, ASTM A572 Grade 65, or 80-micron hot-dip galvanizing) tailored directly to your project's architectural IFC drawings.
Are stamped engineering calculation sheets and mill test certificates supplied?
Every dispatch of FD-PVD-158 is accompanied by certified 3.1 Mill Test Certificates (MTC), ultrasonic weld inspection logs, and structural design calculation sheets stamped by our registered Pakistan Engineering Council (PEC) professional engineers.
Turnkey Procurement · Direct Factory Access

Procure Cast Brass Victorian Staircase Baluster Spindle (Commercial Series) (FD-PVD-158) Directly

Connect directly with Chairman Mian Usman and our chief estimating engineers for certified BOQ pricing, stamped CAD drawing submittals, and factory production slots.

WhatsApp Chief Engineer (+92 332 2227426) →