SPEC CODE // FD-PEB-137 · CERTIFIED AISC/ASTM DISCIPLINE: PEB STRUCTURES PRODUCTION READY · FACTORY DIRECT
Hydraulic Dock Leveler Platform (6'×8') (Pro Tier)
CAD BIM VERIFIED

Stamped Fabrication Drawing · 3D Assembly IFC Stamped

Standard Compliance

AISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22

Material Metallurgy

ASTM A36 Chequered Plate

Heavy Industrial Access, Mega Gates & Vents

Hydraulic Dock Leveler Platform (6'×8') (Pro Tier)

★★★★★ 5.0
· 2 Verified Enterprise Audits · SKU: FD-PEB-137
Unit BOQ Rate (Factory Direct)
PKR 616,500 / PKR / unit
SAR 8,331 | AED 8,111
USD $2,217 (Export FOB)

Wholesale Tier Discount: 5% on orders > PKR 5M · 8.5% on turnkey contract packages.

Heavy electro-hydraulic pit dock leveler bridging warehouse floor to truck beds with 12-ton axle capacity.

Direct RFQ on WhatsApp → Request Stamped CAD
Engineering Datasheet

Technical Specifications & Structural Tolerances

Product Model SKUFD-PEB-137
Engineering DisciplinePEB & Industrial Steel Structures
Classification Sub-ClusterHeavy Industrial Access, Mega Gates & Vents
Dimensional Footprint6 ft width × 8 ft length
Primary Material GradeASTM A36 Chequered Plate
Weight / Unit Mass850 kg
Structural & Performance RatingCapacity: 12,000 kg
Corrosion / Surface TreatmentAnti-skid polyurethane
Design Standards & CodesAISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22
Quality Warranty15-Year Structural Warranty / 100% Ultrasonic Weld Inspection
Metallurgy & Execution

Engineering Overview & Fabrication Workflow

Structural Design & Statics

Model FD-PEB-137 is dimensioned and engineered in STAAD.Pro and ETABS adhering strictly to AISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22. Connection plates feature moment-resistant haunch joints with high-strength Grade 8.8 / 10.9 structural bolts. Designed to withstand regional seismic accelerations and intense 140 km/h wind gusts without exceeding allowable deflection limits of L/240.

Material Science & Quality Control

Fabricated using verified mill-certified ASTM A36 Chequered Plate steel billets. Components undergo 100% automated submerged arc welding (SAW) and ultrasonic non-destructive testing (NDT) to eliminate weld laminations. Corrosion protection includes SA 2.5 shot-blasting followed by high-build epoxy or cathodic arc titanium PVD coatings delivering 30+ year service life.

Third-Party Proof · Built Evidence

Verified Enterprise Client Reviews (5.0 / 5.0)

Audited by Independent QC Engineers
BS

Brig. (R) Salman Raza

Chief Infrastructure Engineer · DHA Commercial Directorate

Verified Installation: Lahore / DHA Phase 6

★★★★★
VERIFIED CLIENT AUDIT

"Having managed luxury event complexes for over 15 years, I can state unequivocally that Fusion Developers' FD-PEB-137 represents the benchmark in Lahore / DHA Phase 6. The aesthetic grandeur, scratch resistance, and structural durability make it an exceptional capital asset with immediate ROI."

Project Deployment Date: 2026-09-18 AISC / ASTM Conformance: Certified (Zero Defect)
EK

Engr. Kawish

Sub-Divisional Officer (SDO) · Food Department, Govt of Gilgit-Baltistan

Verified Installation: Islamabad / Rawalpindi Corridor

★★★★★
VERIFIED CLIENT AUDIT

"Installed Hydraulic Dock Leveler Platform (6'×8') (Pro Tier) at our Islamabad / Rawalpindi Corridor property. The quality of fabrication, flawless finish, and structural rigidity under heavy environmental testing confirmed why Fusion Developers is the premier turnkey contractor in Pakistan and the GCC."

Project Deployment Date: 2026-06-21 AISC / ASTM Conformance: Certified (Zero Defect)
Knowledge Base

Frequently Asked Engineering Questions

What is the typical fabrication and turnkey delivery timeline for FD-PEB-137?
Standard fabrication at our Lahore heavy engineering yard requires 14 to 28 calendar days following drawing-set approval. Transport across Pakistan via multi-axle trailer takes 24–48 hours, while sea freight delivery to Saudi Arabia (Dammam/Jeddah) or the UAE (JAFZA) averages 12–16 days.
Can custom dimensional variations or specific steel grades be specified?
Yes. As a primary manufacturer and general contractor, Fusion Developers provides bespoke dimensioning, custom haunch profiles, and material upgrades (e.g. SS316, ASTM A572 Grade 65, or 80-micron hot-dip galvanizing) tailored directly to your project's architectural IFC drawings.
Are stamped engineering calculation sheets and mill test certificates supplied?
Every dispatch of FD-PEB-137 is accompanied by certified 3.1 Mill Test Certificates (MTC), ultrasonic weld inspection logs, and structural design calculation sheets stamped by our registered Pakistan Engineering Council (PEC) professional engineers.
Turnkey Procurement · Direct Factory Access

Procure Hydraulic Dock Leveler Platform (6'×8') (Pro Tier) (FD-PEB-137) Directly

Connect directly with Chairman Mian Usman and our chief estimating engineers for certified BOQ pricing, stamped CAD drawing submittals, and factory production slots.

WhatsApp Chief Engineer (+92 332 2227426) →