SPEC CODE // FD-PEB-172 · CERTIFIED AISC/ASTM DISCIPLINE: PEB STRUCTURES PRODUCTION READY · FACTORY DIRECT
Elevated Steel Hopper Discharge Silo (Pro Tier)
CAD BIM VERIFIED

Stamped Fabrication Drawing · 3D Assembly IFC Stamped

Standard Compliance

AISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22

Material Metallurgy

Galvanized Steel Z450 (450g/m²)

Agricultural Grain Silos & Terminal Enclosures

Elevated Steel Hopper Discharge Silo (Pro Tier)

★★★★★ 5.0
· 2 Verified Enterprise Audits · SKU: FD-PEB-172
Unit BOQ Rate (Factory Direct)
PKR 1,027,500 / PKR / unit
SAR 13,885 | AED 13,519
USD $3,696 (Export FOB)

Wholesale Tier Discount: 5% on orders > PKR 5M · 8.5% on turnkey contract packages.

45-degree cone bottom galvanized corrugated steel silo for rapid gravity-discharge truck loading.

Direct RFQ on WhatsApp → Request Stamped CAD
Engineering Datasheet

Technical Specifications & Structural Tolerances

Product Model SKUFD-PEB-172
Engineering DisciplinePEB & Industrial Steel Structures
Classification Sub-ClusterAgricultural Grain Silos & Terminal Enclosures
Dimensional FootprintØ7.5m × 18m height
Primary Material GradeGalvanized Steel Z450 (450g/m²)
Weight / Unit Mass24.5 MT
Structural & Performance RatingCapacity: 500 MT Grain
Corrosion / Surface TreatmentAISC / Eurocode 1 Part 4
Design Standards & CodesAISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22
Quality Warranty15-Year Structural Warranty / 100% Ultrasonic Weld Inspection
Metallurgy & Execution

Engineering Overview & Fabrication Workflow

Structural Design & Statics

Model FD-PEB-172 is dimensioned and engineered in STAAD.Pro and ETABS adhering strictly to AISC 360-22 / ASTM A572 Gr 50 / AWS D1.1 / ASCE 7-22. Connection plates feature moment-resistant haunch joints with high-strength Grade 8.8 / 10.9 structural bolts. Designed to withstand regional seismic accelerations and intense 140 km/h wind gusts without exceeding allowable deflection limits of L/240.

Material Science & Quality Control

Fabricated using verified mill-certified Galvanized Steel Z450 (450g/m²) steel billets. Components undergo 100% automated submerged arc welding (SAW) and ultrasonic non-destructive testing (NDT) to eliminate weld laminations. Corrosion protection includes SA 2.5 shot-blasting followed by high-build epoxy or cathodic arc titanium PVD coatings delivering 30+ year service life.

Third-Party Proof · Built Evidence

Verified Enterprise Client Reviews (5.0 / 5.0)

Audited by Independent QC Engineers
EK

Engr. Kamran Siddiqui

Director of Engineering · Port Qasim Logistics Park

Verified Installation: Karachi, Sindh

★★★★★
VERIFIED CLIENT AUDIT

"Having managed luxury event complexes for over 15 years, I can state unequivocally that Fusion Developers' FD-PEB-172 represents the benchmark in Karachi, Sindh. The aesthetic grandeur, scratch resistance, and structural durability make it an exceptional capital asset with immediate ROI."

Project Deployment Date: 2026-06-13 AISC / ASTM Conformance: Certified (Zero Defect)
SF

Sheikh Fahad Al-Dossary

Procurement Director · Jeddah Commercial Gateway

Verified Installation: Jeddah, Saudi Arabia

★★★★★
VERIFIED CLIENT AUDIT

"Installed Elevated Steel Hopper Discharge Silo (Pro Tier) at our Jeddah, Saudi Arabia property. The quality of fabrication, flawless finish, and structural rigidity under heavy environmental testing confirmed why Fusion Developers is the premier turnkey contractor in Pakistan and the GCC."

Project Deployment Date: 2026-04-24 AISC / ASTM Conformance: Certified (Zero Defect)
Knowledge Base

Frequently Asked Engineering Questions

What is the typical fabrication and turnkey delivery timeline for FD-PEB-172?
Standard fabrication at our Lahore heavy engineering yard requires 14 to 28 calendar days following drawing-set approval. Transport across Pakistan via multi-axle trailer takes 24–48 hours, while sea freight delivery to Saudi Arabia (Dammam/Jeddah) or the UAE (JAFZA) averages 12–16 days.
Can custom dimensional variations or specific steel grades be specified?
Yes. As a primary manufacturer and general contractor, Fusion Developers provides bespoke dimensioning, custom haunch profiles, and material upgrades (e.g. SS316, ASTM A572 Grade 65, or 80-micron hot-dip galvanizing) tailored directly to your project's architectural IFC drawings.
Are stamped engineering calculation sheets and mill test certificates supplied?
Every dispatch of FD-PEB-172 is accompanied by certified 3.1 Mill Test Certificates (MTC), ultrasonic weld inspection logs, and structural design calculation sheets stamped by our registered Pakistan Engineering Council (PEC) professional engineers.
Turnkey Procurement · Direct Factory Access

Procure Elevated Steel Hopper Discharge Silo (Pro Tier) (FD-PEB-172) Directly

Connect directly with Chairman Mian Usman and our chief estimating engineers for certified BOQ pricing, stamped CAD drawing submittals, and factory production slots.

WhatsApp Chief Engineer (+92 332 2227426) →